Parr-instrument ETLM-HTML Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Sensoren Parr-instrument ETLM-HTML herunter. Parr Instrument ETLM-HTML User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 8
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Installation Instructions for
External Temperature Limit Module (ETLM)
559M
Meter Installation in 4848 Reactor
Controller
Unplug the power cord of the 4848 Controller. 1.
Remove the (2) screws located on the top/front
cover at the rear corners of the controller. Gen-
tly lift the cover forward, which is hinged at the
bottom, taking care not to apply tension on any
internal wiring.
If applicable, remove and discard the black hole 2.
plug on the sloped front panel above the “TEM-
PERATURE” text. This can be done by pinching
the clasps on the back of the plug from the inside
of the front plate.
Insert the meter (2082E) through the panel cut-3.
out, from outside in, making sure the rubber
gasket is on the outside of the controller front
panel. (If wires are preinstalled, remove the
terminal connector by releasing the tabs on the
sides of the module and gently pulling the termi-
nal connector off. Reference photos below.) Slide
the white mounting bracket onto the module with
the mounting screws pointing towards the front
panel. Slide the mounting bracket forward until
it touches the controller panel. The clasps on the
mounting bracket should align with the groves
on the module. Gently tighten the screws until
the module is held into place. (If removed, reat-
tach the terminal connector.)
Terminal Connector Removal
Seitenansicht 0
1 2 3 4 5 6 7 8

Inhaltsverzeichnis

Seite 1 - Controller

Installation Instructions for External Temperature Limit Module (ETLM)559MMeter Installation in 4848 Reactor ControllerUnplug the power cord of the 48

Seite 2 - HTML Installation

HTML InstallationParr Instrument Company2Meter Installation in 4848 Reactor Controller (Continued)Meter Installation Diagram

Seite 3

HTML Installationwww.parrinst.com37 8 9 10 11 121 2 3 4 5 62082E Pin Out(Pin 5 is blank)Picture of 2082E Pin OutWiring Installation in 4848 Reactor Co

Seite 4

HTML InstallationParr Instrument Company4Wiring Installation in 4848 Reactor Controller (Continued)Warning: Take care not to apply too much torque wh

Seite 5

HTML Installationwww.parrinst.com5Locate the free yellow wire #5 from the kit and 8. attach one end to pin 10 on the 2082E meter. The other end attac

Seite 6

HTML InstallationParr Instrument Company6Factory Default Settings - ETLMKeys command:Press “SET” to select 1. Press return key move to next operation

Seite 7

HTML Installationwww.parrinst.com7This page intentionally left blank.

Kommentare zu diesen Handbüchern

Keine Kommentare